• 2026.03.24 (Tue)
  • All articles
  • LOGIN
  • JOIN
Global Economic Times
fashionrunwayshow2026
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Well+Being
  • Travel
  • Eco-News
  • Education
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life
    • International Student Report
    • With Ambassador
  • Column
    • Cho Kijo Column
    • Cherry Garden Story
    • Ko Yong-chul Column
    • Kim Seul-Ong Column
    • Lee Yeon-sil Column
  • Photo News
  • New Book Guide
MENU
 
Home > Synthesis

Paraguay's Barrio Obrero Hospital: Delayed Construction Worsens Healthcare System Crisis

Greace Nunez Correspondent / Updated : 2025-07-04 12:32:04
  • -
  • +
  • Print

 

Construction to renovate the neonatal and delivery rooms at the Barrio Obrero General Hospital in Asunción, Paraguay, which began in September 2024, has still not been completed nearly 10 months later, leading to severe problems. Despite promises of completion in May of this year, the work continues to be delayed. The National Medical Union (Sinamed) has expressed concern, citing staff shortages and poor planning as the main reasons.

According to complaints from medical staff, patients are currently giving birth in temporary spaces that lack proper privacy or sanitation, with some even having to "give birth on staircases or in hospital corridors." This is a serious violation of infection control protocols and poses a significant threat to patients' health and safety.

Dr. Rosanna González emphasized the importance of prioritizing the construction, stating, "This country must take health seriously. Impromptu responses won't do." She criticized that despite the urgent need for repairs due to the risk of roof collapse caused by termites, construction has been intermittent, sometimes with no workers to be found. These delays have led to a reduction in available beds, causing overcrowding with patients spilling into hospital corridors, and creating risks for surgical and medical patients.

Recently, the hospital again became the subject of public criticism when an advanced life support ambulance, introduced through Itaipu Binacional, broke down after transporting a patient. Hospital director Adán Godoy explained that the ambulance's malfunction was due to an electronic issue and that it would be serviced and restarted.

Itaipu Binacional has played a crucial role in improving Paraguay's healthcare infrastructure, supporting projects to strengthen telemedicine services and enhance hospital connectivity. It has also consistently contributed to the health sector, recently assisting with the construction of general hospitals in Concepción and Curuguaty, totaling $41 million.

Paraguay's healthcare system faces chronic problems. Fragmentation of the system, insufficient geographical access, and low public health expenditure—less than 2% of the GDP—result in severe imbalances. More than 70% of the population lacks health insurance and relies mostly on the Ministry of Public Health and Social Welfare.

Rural areas, in particular, suffer from even poorer access to healthcare services due to inadequate road networks and a shortage of medical personnel. In this situation, the delayed construction at Barrio Obrero Hospital clearly demonstrates the vulnerability of Paraguay's public healthcare system, necessitating an immediate and systematic response from the government and relevant institutions.

International cooperation agencies like the Korea International Cooperation Agency (KOICA) are also working to strengthen primary healthcare facilities and alleviate hospital overcrowding in Paraguay by constructing and renovating health centers. However, long-term investment and efficient resource allocation are urgently needed for overall healthcare infrastructure improvement.

[Copyright (c) Global Economic Times. All Rights Reserved.]

  • #NATO
  • #OTAN
  • #OECD
  • #G20
  • #globaleconomictimes
  • #Korea
  • #UNPEACEKOR
  • #micorea
  • #mykorea
  • #UN
  • #UNESCO
  • #nammidonganews
  • #sin
Greace Nunez Correspondent
Greace Nunez Correspondent

Popular articles

  • Gucci Faces Backlash Over AI-Generated Campaign Ahead of Milan Fashion Week

  • Global Smartphone Market Braces for 10-Year Low as AI Memory Hunger Starves Mobile Industry

  • Mexico on Edge: Cartel Retaliation Sparking Terror Ahead of 2026 FIFA World Cup

I like it
Share
  • Facebook
  • X
  • Kakaotalk
  • LINE
  • BAND
  • NAVER
  • https://www.globaleconomictimes.kr/article/1065583898310742 Copy URL copied.
Comments >

Comments 0

Weekly Hot Issue

  • Celltrion Bets $900M on Massive Expansion, Aiming for 570,000-Liter Global Bio Dominance
  • Hundreds of Millions of Older iPhones at Risk as Hacking Tool Goes Public
  • Hyundai, Kia, and Others Recall Over 400,000 Vehicles Due to Safety Defects
  • KB Financial Group Launches 20 Trillion Won 'Productive Finance' Initiative for 2026
  • Samsung and LG Clash in Milan Over European HVAC Supremacy at MCE 2026
  • INTERX Sets New Global Standard for Manufacturing Data with Semantic AAS Implementation

Most Viewed

1
An Open Letter to BTS On the Eve of a Historic Performance
2
From Industrial Capital to Tourism Mecca... Ulsan Makes a Bold Move with ‘Experiential Content’ in 2026
3
It is Time for BTS’s Fandom, ARMY, to Step Forward
4
Fichee Chambalaalla and Korea’s Lunar New Year: Under the Same Moon
5
Samsung Display Resumes Development of Next-Gen 'QNED' Technology
광고문의
임시1
임시3
임시2

Hot Issue

Samsung and LG Clash in Milan Over European HVAC Supremacy at MCE 2026

U.S. LNG Exporters Emerge as "Big Winners" Amid Middle East Conflict

INTERX Sets New Global Standard for Manufacturing Data with Semantic AAS Implementation

Vishay Unveils Ultra-Compact 0404 RGB LED with Independent Chip Control for Enhanced Color Precision

Let’s recycle the old blankets in Jeju Island’s closet instead of incinerating them.

Global Economic Times
korocamia@naver.com
CEO : LEE YEON-SIL
Publisher : KO YONG-CHUL
Registration number : Seoul, A55681
Registration Date : 2024-10-24
Youth Protection Manager: KO YONG-CHUL
Singapore Headquarters
5A Woodlands Road #11-34 The Tennery. S'677728
Korean Branch
Phone : +82(0)10 4724 5264
#304, 6 Nonhyeon-ro 111-gil, Gangnam-gu, Seoul
Copyright © Global Economic Times All Rights Reserved
  • 에이펙2025
  • APEC2025가이드북TV
  • 독도는우리땅
Search
Category
  • All articles
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Well+Being
  • Travel
  • Eco-News
  • Education
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life 
    • 전체
    • International Student Report
    • With Ambassador
  • Column 
    • 전체
    • Cho Kijo Column
    • Cherry Garden Story
    • Ko Yong-chul Column
    • Kim Seul-Ong Column
    • Lee Yeon-sil Column
  • Photo News
  • New Book Guide
  • Multicultural News
  • Jobs & Workers