• 2026.03.23 (Mon)
  • All articles
  • LOGIN
  • JOIN
Global Economic Times
fashionrunwayshow2026
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Well+Being
  • Travel
  • Eco-News
  • Education
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life
    • International Student Report
    • With Ambassador
  • Column
    • Cho Kijo Column
    • Cherry Garden Story
    • Ko Yong-chul Column
    • Kim Seul-Ong Column
    • Lee Yeon-sil Column
  • Photo News
  • New Book Guide
MENU
 
Home > Synthesis

Nationwide Inspection of Public Hospital Electrical Systems Underway

Ana Fernanda Reporter / Updated : 2025-04-02 18:23:13
  • -
  • +
  • Print
ANDE and the Ministry of Public Health and Social Welfare (MSPyBS) Strengthen Electrical Facility Safety in Hospitals and Health Centers Nationwide

ASUNCIÓN, Paraguay - Paraguay's National Electricity Administration (Administración Nacional de Electricidad, ANDE) and the Ministry of Public Health and Social Welfare (Ministerio de Salud Pública y Bienestar Social, MSPyBS) have announced a simultaneous, comprehensive inspection of the electrical systems in public hospitals and health centers across the country.

This inspection is a proactive measure to assess and improve the status of electrical facilities in health centers nationwide. The launch of the inspection was announced at the Barrio Obrero Hospital in Asunción, with the attendance of relevant authorities. Simultaneously, electrical system inspections are being carried out at medical institutions in various regions across the country.

Key inspection points include: ▲Power supply status ▲Adequacy of transformer capacity (whether it meets facility demand) ▲Internal electrical equipment inspection (including main and auxiliary distribution boards). The goal of this inspection is to enhance the safety and convenience of patients, guardians, and medical personnel.

ANDE will deploy approximately 50 specialized inspection teams to complete the inspection of the power supply status of facilities under the public health system within 30 days.

Background and Expected Effects

In recent years, concerns have been steadily raised regarding power supply instability and safety issues due to the aging electrical systems in public medical facilities. In particular, the malfunction of medical equipment or power outages during emergencies can pose a serious threat to patient safety.

This nationwide inspection aims to accurately identify the current status of electrical systems in each medical institution and improve outdated or substandard equipment, thereby ensuring the stability of power supply and preventing fire and electric shock accidents. Furthermore, securing sufficient transformer capacity is expected to guarantee the smooth operation of medical equipment and provide a safer and more comfortable medical environment for patients.

A representative from the Ministry of Public Health and Social Welfare stated, "Through this collaboration with ANDE, we will systematically inspect and improve the electrical systems of public medical facilities nationwide and do our best to ensure that both patients and medical staff can use and provide medical services in a safe environment."

An ANDE official added, "Based on the results of this inspection, we will prepare customized improvement plans for each facility and promptly carry out equipment replacement and maintenance work to contribute to the improvement of the quality of medical services."

This nationwide inspection of public hospital electrical systems is expected to be a significant step in enhancing the safety and reliability of Paraguay's public health system.

[Copyright (c) Global Economic Times. All Rights Reserved.]

  • #globaleconomictimes
  • #한국
  • #중기청
  • #재외동포청
  • #외교부
  • #micorea
  • #mykorea
  • #newsk
  • #nammidonganews
  • #singaporenewsk
  • #타이완포스트
  • #김포공항
Ana Fernanda Reporter
Ana Fernanda Reporter

Popular articles

  • Google Unveils ‘Nano Banana 2’: Pro-Level Image AI Now Free for All

  • Samsung Display Resumes Development of Next-Gen 'QNED' Technology

  • Chinese Zoo Caught Using Dead Tiger Cub’s Footage in Live Stream to Solicit Donations

I like it
Share
  • Facebook
  • X
  • Kakaotalk
  • LINE
  • BAND
  • NAVER
  • https://www.globaleconomictimes.kr/article/1065604951450421 Copy URL copied.
Comments >

Comments 0

Weekly Hot Issue

  • Coway Clinches Top Honor at "Water Taste Awards" for 7th Consecutive Year
  • HP Targets Korea as Strategic Hub for 'Edge AI' Expansion, Seeking Startup Partnerships
  • Pearl Abyss’s 'Crimson Desert' Shatters Records with 2 Million Copies Sold on Day One
  • "BTS Over Books?" Indian Academies Issue Emergency Notices as Students Plot Mass Absences for Comeback Live
  • Naver to Shut Down Men's Fashion Service 'MR.' to Launch Expanded AI-Driven Fashion Platform
  • JBNU and SKKU Researchers Achieve Breakthrough in "Dream Material" MXene, Setting New World Records in Performance

Most Viewed

1
An Open Letter to BTS On the Eve of a Historic Performance
2
From Industrial Capital to Tourism Mecca... Ulsan Makes a Bold Move with ‘Experiential Content’ in 2026
3
Ko Sang-goo, President of World Federation of Korean Associations, Elected as First Private Sector Chair of World Korean Community Leaders Convention
4
It is Time for BTS’s Fandom, ARMY, to Step Forward
5
Korean Stock Market Plunges: Circuit Breaker and Sidecar Triggered Amid Geopolitical Crisis
광고문의
임시1
임시3
임시2

Hot Issue

Vishay Unveils Ultra-Compact 0404 RGB LED with Independent Chip Control for Enhanced Color Precision

Coway Clinches Top Honor at "Water Taste Awards" for 7th Consecutive Year

AI Medical Ecosystem in Focus: KIMES 2026 Opens in Seoul as Global Healthcare Hub

Netanyahu Declares Decisive Blow to Iran’s Nuclear and Missile Programs, Signals Early End to War

Let’s recycle the old blankets in Jeju Island’s closet instead of incinerating them.

Global Economic Times
korocamia@naver.com
CEO : LEE YEON-SIL
Publisher : KO YONG-CHUL
Registration number : Seoul, A55681
Registration Date : 2024-10-24
Youth Protection Manager: KO YONG-CHUL
Singapore Headquarters
5A Woodlands Road #11-34 The Tennery. S'677728
Korean Branch
Phone : +82(0)10 4724 5264
#304, 6 Nonhyeon-ro 111-gil, Gangnam-gu, Seoul
Copyright © Global Economic Times All Rights Reserved
  • 에이펙2025
  • APEC2025가이드북TV
  • 독도는우리땅
Search
Category
  • All articles
  • Synthesis
  • World
  • Business
  • Industry
  • ICT
  • Distribution Economy
  • Well+Being
  • Travel
  • Eco-News
  • Education
  • Korean Wave News
  • Opinion
  • Arts&Culture
  • Sports
  • People & Life 
    • 전체
    • International Student Report
    • With Ambassador
  • Column 
    • 전체
    • Cho Kijo Column
    • Cherry Garden Story
    • Ko Yong-chul Column
    • Kim Seul-Ong Column
    • Lee Yeon-sil Column
  • Photo News
  • New Book Guide
  • Multicultural News
  • Jobs & Workers