
PRAGUE — South Korea’s state-run nuclear operator, Korea Hydro & Nuclear Power (KHNP), has intensified on-the-ground preparations and stakeholder consultations in the Czech Republic as it works toward securing a construction permit for the Dukovany nuclear power project by April 2027.
During a four-day visit concluding on the 27th, a South Korean delegation led by KHNP Executive Vice President Choi Il-kyung—joined by executives from key partners Doosan Enerbility and KEPCO E&C—held high-level meetings with Czech government officials, project owner CEZ, and local nuclear manufacturers to align schedules ahead of a planned 2029 construction start.
Expanding Local Presence and Project Management
A central milestone of the trip was the inauguration of KHNP’s new Dukovany Construction Site Office on the 25th. Staffed by roughly 20 permanent personnel, the office will serve as a local hub to streamline engineering, licensing support, site readiness, and daily coordination with the project subsidiary, EDU II.
In subsequent talks with CEZ’s new nuclear division on the 26th, both parties agreed to establish tighter joint management over pre-construction engineering and regulatory procedures to prevent bottlenecks.
Supply Chain Integration and Bilateral Ties
Beyond site logistics, the Korean delegation focused heavily on integrating Czech industry into the project's supply chain:
Government Alignment: Meeting with Tomáš Ehler, head of the nuclear department at the Czech Ministry of Industry and Trade, Choi discussed frameworks to maximize domestic industrial participation.
Industrial Partnerships: Separate discussions with local turbine and reactor equipment makers Doosan Škoda Power and Škoda JS centered on component supply agreements. These talks serve as groundwork for the upcoming December visit to Seoul by the Czech First Deputy Prime Minister and Minister of Industry and Trade, where broader corporate cooperation deals are expected to be formalized.
Community Engagement: Signaling a commitment to long-term regional acceptance, KHNP also renewed its local ice hockey team sponsorship in Dukovany, a partnership dating back to 2018.
"The success of the Dukovany project hinges on precise execution across design, licensing, and site preparation phases," Choi stated, reaffirming that the "Team Korea" consortium will maintain close working-level alignment with Czech authorities to meet its 2027 and 2029 targets.
[Copyright (c) Global Economic Times. All Rights Reserved.]



























